5 Leakage through rock fractures below a dam can be reduced significantly by (A) bolting (B) grouting C) drilling (D) blasting 6 Consider the following statements regarding way-up criteria in sets of trough cross-beds. P: Cross-beds are concave upwards Q: Cross-beds are truncated towards the top R: Cross-beds have tangential contact towards the bottom (A) P is true, Q is false and R is true (B) P is false, Q is true and R is true (C)P is true, Q is true and R is true (D) P is false, Q is false and R is false
  • 2 Answer(s)
  • 0 Likes
  • 6 Comments
  • Shares
  • Sashi
    I think what sajan sir is saying that is true
    Likes(1) Reply(0)
  • Sajan sarthak sahoo
    For Trough cross bed relationship the P and R that is they have concave upward and tangential relationship with lower bed is true and they are truncated to the bottom bed so Q is ...
    Show more
    • cropped5297848403801800777.jpg
    Likes(0) Reply(12)
    Shivam sharma
    Rahul bhaiya is saying it is truncated towards top
  • Rahul pandey Best Answer
    5. Ans(B) Grouting Grouting refers to the injection of pumpable materials into a soil or rock formation to avoid seepage. 6. Ans(C) P is true, Q is true, R is true Trough cross b...
    Show more
    • cropped4350188743003496577.jpg
    Likes(0) Reply(0)
  • Shivam sharma
    ok
    Likes(0) Reply(0)
  • Sajan sarthak sahoo thankyou
    Leakage through a fracture can be stopped through grouting. Grout is usually a mixture of cement, sand, and water or chemicals that are used to fill gaps. They are used in repair...
    Show more
    Likes(0) Reply(1)
    Shivam sharma
    Answer the question of cross beds
  • Shivam sharma
    (5) Grouting ?
    Likes(1) Reply(0)
Head Office :
MPA 44, 2nd floor, Rangbari main Road Mahaveer Nagar II, Kota (Raj.) - 324005

Branch Office (Jaipur):
Shyam Tower, Plot No. F2, 6th Floor Amrapali Circle,
Vaishali Nagar, Jaipur, Rajasthan 302021

Mail: info@eduncle.com
All Rights Reserved © Eduncle.com